top of page

AD-7 - CAD Architectural Working
Drawing-Multi-Family

Rules for Category:

Maximum of 12 sheets. Working drawings must show acceptable construction techniques and specifications dictated by building codes and ordinances. The structure must have two or more independent units (duplex, apartment building, etc.)


All drawings must be plotted or printer plotted on a drawing media to scale. No photo realistic drawings or color allowed.

24-25

Architectural Working Drawing

© 2035 by Timberland. Powered and secured by Wix

Michigan Industrial Technology Education Society
P.O. Box 2518

Midland, MI 48641-2518

cto@mites.cc

  • Black Facebook Icon
  • X
bottom of page